Glossary · term
Hyperion / Prometheus (Meta)
Names of Meta's giant compute clusters built for "superintelligence." Prometheus (New Albany, Ohio) is set to launch in 2026 as the first multi-gigawatt campus; Hyperion (Richland Parish, Louisiana) ultimately targets around 5 GW of power. Announced by Mark Zuckerberg in 2025, alongside Stargate and xAI Colossus.
LLMOpsVII 2025Wave 2 · 2024Maturity: 1/5
Maturity rationale
single R2 source, 2025-26 neologism
References
- Data Center Frontier: Ownership and Power Challenges in Meta's Hyperion and Prometheus(blog)
- Fortune: Meta's $10bn Hyperion AI data center expansion(blog)
Author: Meta
Cite or link to this resource · CC BY 4.0
Free to quote, link, and reuse with attributionReferencing this analysis in documentation, research, or an engineering write-up? Copy a formatted link or citation below:
Show citation text & canonical URL
Markdown:
[Hyperion / Prometheus (Meta) — AI Glossary — Skills Intelligence](https://www.skillsintelligence.tools/glossary/term/hyperion-prometheus-meta)APA:
Skills Intelligence. (VII ). Hyperion / Prometheus (Meta) — AI Glossary. Skills Intelligence AI Glossary. Retrieved from https://www.skillsintelligence.tools/glossary/term/hyperion-prometheus-meta