Glossary · term

Hyperion / Prometheus (Meta)

Names of Meta's giant compute clusters built for "superintelligence." Prometheus (New Albany, Ohio) is set to launch in 2026 as the first multi-gigawatt campus; Hyperion (Richland Parish, Louisiana) ultimately targets around 5 GW of power. Announced by Mark Zuckerberg in 2025, alongside Stargate and xAI Colossus.

LLMOpsVII 2025Wave 2 · 2024Maturity: 1/5

Maturity rationale

single R2 source, 2025-26 neologism

References

Author: Meta

Cite or link to this resource · CC BY 4.0
Free to quote, link, and reuse with attribution

Referencing this analysis in documentation, research, or an engineering write-up? Copy a formatted link or citation below:

Show citation text & canonical URL
Markdown: [Hyperion / Prometheus (Meta) — AI Glossary — Skills Intelligence](https://www.skillsintelligence.tools/glossary/term/hyperion-prometheus-meta)
APA: Skills Intelligence. (VII ). Hyperion / Prometheus (Meta) — AI Glossary. Skills Intelligence AI Glossary. Retrieved from https://www.skillsintelligence.tools/glossary/term/hyperion-prometheus-meta